Asbestos Abatement for industrial site managers in Bristol
HSE guidance says clients should give their contractor a refurbishment or demolition survey by a competent surveyor and relevant pre-construction information before demolition starts. The survey information should identify the areas and materials considered, any access limitations, and the information needed for the responsible dutyholders to plan the work. If information is incomplete or material is suspected, do not assume that a tendered method remains suitable.
When comparing proposals, ask each bidder to state the scope it is offering, the survey information it relies on, the competence and licensing it says are required, its interfaces with the site operator, its programme constraints, and its waste and record-keeping assumptions. The appropriate arrangements will depend on the material, the site, the legal duties, and whether work could disturb asbestos.
