About Horfield
The structure itself needs a clear record. State whether the garage is masonry, concrete panel, timber or another construction only where this is known, and photograph roof sheets without trying to diagnose them. Mark walls shared with a neighbour, attachments to the house, electrical supplies, drainage and anything stored against the exterior. If materials are uncertain, ask what survey is needed before disturbance. The written scope should say whether the slab, foundations, doors and contents are included.
Boundary and future-use decisions shape the end condition. Removing one half of a paired garage may expose or destabilise the other half. Taking out a garage beside a house can reveal unfinished wall faces or service entries. If the cleared area is intended for garden use, parking or later construction, the required treatment of hardstanding and drainage may differ. Obtain design or party-wall advice where relevant and give all bidders the same retained-wall and ground requirements.