Useful context for Totterdown
The first task is to describe the section through the plot. Photographs should show the building from above and below, the position of steps, garden walls, cellars and retaining features, and its relationship with both neighbours. A plan view alone can miss the load carried by a wall or the distance material must move vertically before reaching the road. State which structure will be removed and which wall, terrace, path or planted bank remains. A competent designer can then decide what survey and temporary-support information is needed.
Terraced construction adds shared interfaces. Rear additions built at different dates may touch party walls without matching next door, while drainage and services can cross narrow gardens. A proposal should explain how adjoining fabric is investigated and protected, and whether party-wall advice is relevant to the actual work. Older finishes or roofing may require material assessment; do not infer composition from age or appearance. Ask each bidder to identify accessible evidence, remaining uncertainties and the point at which specialist advice would alter the sequence.
